The acceptance basis
Share the named coolant, current supplier guidance, equipment requirements and project specifications. Agree which criteria apply before samples are taken.
Commissioning & baseline
Offline laboratory testing of PG25 coolant samples, with interpretation against your project requirements. A clear fluid-condition record for the commissioning review and the operating team that follows.

A physical coolant sample captures the condition of the fluid at a defined point in the commissioning process. We help turn that sample into evidence the MEP, commissioning authority and operator can review together.
Share the named coolant, current supplier guidance, equipment requirements and project specifications. Agree which criteria apply before samples are taken.
Identify whether the sample is new fluid, post-fill coolant or a circulated commissioning sample. Different stages answer different questions.
Tell us the required review date and who needs the report. We confirm laboratory turnaround and logistics before collection, rather than promise a universal deadline.
What the report supports
A coolant report is one part of commissioning evidence. It is not a certificate that the entire cooling system is safe or ready for service. Final acceptance belongs to the project’s designated authority.
Physical sample → laboratory analysis → technical review
Illustrative structure only. No sample results or approval are shown.
From your site to a reviewed report
Tell us the fluid, location, stage and decision. We confirm scope, timing and the laboratory route.
Use the agreed container, sampling point and handling instructions. Collection and shipping can be coordinated.
The receiving laboratory performs the agreed tests on your physical coolant sample.
Your report connects the results to the named fluid, loop history and decision, with interpretation and recommended next checks.
We confirm the analytical panel, sample quantity, preservation and applicable criteria for the named product. Full test plans are shared through your enquiry.
The OCP modular TCS guidance, Appendix G, covers commissioning cleanliness and ongoing fluid integrity. Use it alongside the requirements agreed for your project.
Explore annual and periodic testingLet’s make the next step easy
Build a short brief. Then our team confirms the testing plan and sample arrangements.