Annual & periodic testing
Recurring offline coolant testing for operating data centers. VeriFluid compares your sample with the baseline and earlier results, then interprets the findings in the context of your loop. Annual or more frequent sampling is agreed for your site.

A single result is a snapshot. A consistent series of physical samples helps your team understand changes in an operating coolant loop. VeriFluid provides the recurring testing programme and human-reviewed interpretation, with sampling arrangements agreed across your sites.
Share the commissioning report or earlier sample results when available. Keep sample points, fluid identity, units and method changes visible.
Use the supplier and equipment guidance, site risk and previous results to set the sampling interval. No single calendar fits every PG25 loop.
Record top-ups, refills, maintenance, equipment additions and unusual operating events. These details can change what a result means and when another sample is useful.
Set the cadence around the loop
An annual programme is a service option, not a universal rule for PG25. The current fluid-supplier, equipment and site requirements define the interval.
For an established, stable loop, an annual sample can form part of the agreed fluid-care programme. Review the trend, operating changes and the sampling plan together.
Commissioning and early operation can need closer checks while the system stabilises. Previous findings and site risk may also justify a shorter interval.
Do not wait for the annual date after an unexpected result, contamination concern, major top-up, refill or equipment change. Discuss the event and the appropriate next sample.
Dow’s product-specific data center guidance describes moving to annual testing after stable operation, with closer sampling during commissioning and earlier service. This is context for a named product, not a schedule for every coolant or site.
What the report supports
Each report describes the submitted physical sample. Interpret the results with its collection conditions, previous samples and your operating history.
Physical sample → laboratory analysis → technical review
Illustrative structure only. No sample results or approval are shown.
From your site to a reviewed report
Tell us the fluid, location, stage and decision. We confirm scope, timing and the laboratory route.
Use the agreed container, sampling point and handling instructions. Collection and shipping can be coordinated.
The receiving laboratory performs the agreed tests on your physical coolant sample.
Your report connects the results to the named fluid, loop history and decision, with interpretation and recommended next checks.
We confirm the analytical panel, sample quantity, preservation and applicable criteria for the named product. Full test plans are shared through your enquiry.
The manufacturer’s data center coolant guidance links sampling frequency to commissioning stage, operating conditions and stability. Confirm the current schedule for your named product and site.
Preparing a new loop? Explore commissioning testingLet’s make the next step easy
Build a short brief. Then our team confirms the testing plan and sample arrangements.